[1] 李伯虎,张霖,王时龙,等.云制造:面向服务的网络化制造新模式[J].计算机集成制造系统,2010,16(1):1-7.
[2] 李伯虎,张霖,任磊,等.再论云制造[J].计算机集成制造系统,2011,17(3):449-457.
[3] 李伯虎,张霖,任磊,等.云制造典型特征、关键技术与应用[J].计算机集成制造系统,2012,18(7):1345-1356.
[4] Noga J. Scheduling with machine cost[C]//International Workshop on Approximation Algorithms for Combinatorial Optimization Problems: Randomization, Approximation, and Combinatorial Algorithms and Techniques. SpringerVerlag,1999:168-176.
[5] Imreh C. Online scheduling with general machine cost functions[J]. Electronic Notes in Discrete Mathematics,2006,27(9):49-50.
[6] Jiang Y W, He Y. Preemptive online algorithms for scheduling with machine cost[J]. Acta Informatica,2005,41(6):315-340.
[7] Dosa G, Tan Z Y. New upper and lower bounds for on line scheduling with machine cost[J]. Discrete Optimization,2010,7(3):125-135.
[8] Rustogi K, Strusevich A V. Parallel machine scheduling: Impact of adding extra machines[J]. Operations Research,61(5):1243-1257.
[9] Jiang Y W, He Y. SemiOnline Algorithms for scheduling with machine cost[J]. Journal of Computer Science and Technology,2006,21(6):984-988.
[10] He C, Leung YT, Lee K, et al. Scheduling a single machine with parallel batching to minimize makespan and total rejection cost[J]. Discrete Applied Mathematics,2016,204(C):150-163.