[1] 李欣.接地网地面电位分布及梯度分布的计算研究[D].成都:西华大学,2010.
[2] 王洪泽,杨丹,王梦云.接地技术手册[M].北京:中国电力出版社,2007.
[3] 中华人民共和国住房和城乡建设部,中华人民共和国国家质量监管检验检疫总局. 交流电气装置的接地设计规范:GB 500652011[S].北京:中国计划出版社,2011.
[4] 马俊阳,吴在军,窦晓波,等.电力系统接地网仿真计算分析系统的设计及实现[J].电测与仪表, 2014, 51(9):6-12.
[5] 卢玲.论变电站接地网装置设计[J].科技与企业,2013(24):336.
[6] NATH T, ATTARZADEH M, TIONG R L K, et al. Productivity improvement of precast shop drawings generation through BIMbased process reengineering[J]. Automation in Construction, 2015, 54: 54-68.
[7] WANG C, CHO Y K, KIM C. Automatic BIM component extraction from point clouds of existing buildings for sustainability applications[J]. Automation in Construction, 2015, 56: 1-13.
[8] KIM J B, JEONG W, CLAYTON M J, et al. Developing a physical BIM library for building thermal energy simulation[J]. Automation in Construction, 2015, 50: 16 -28.
[9] GAO G, LIU Y S, WANG M, et al. A query expansion method for retrieving online BIM resources based on Industry Foundation Classes[J]. Automation in Construction, 2015, 56: 14-25.
[10] SOLIHIN W, EASTMAN C. Classification of rules for automated BIM rule checking development[J]. Automation in Construction, 2015, 53: 69-82.
[11] EBRAHIM P K, LRIZARRY J. Extending BIM interoperability to preconstruction operations using geospatial analyses and semantic web services[J]. Automation in Construction, 2015, 53: 1-12.
[12] FENG C W, CHEN Y J, LEE K W. BIM modelbased Mechanical, Electrical and Plumbing (MEP) integration and coordination system[J]. Gerontechnology, 2012, 11(2): 74.