[1] Koulamas C. Scheduling two parallel semiautomatic machines to minimize machine interference[J]. Computers and Operations Research,1996,23(10):945-56.
[2] Ganesharajah T, Hall N, Sriskandarajah, C. Design and operational issues in AGVserved manufacturing systems[J]. Annals of Operations Research,1998,76(1):109-154.
[3] Dawande M, Geismar H, Sethi S, et al. Sequencing and scheduling in robotic cells:Recent developments[J]. Journal of Scheduling,2005,8(5):387-426.
[4] Kim M Y, Lee Y H. MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server[J]. Computers and Operations Research,2012,39(11):2457-2468.
[5] Kravchenko S, Werner F. Parallel machine scheduling problems with a single server[J]. Mathematical and Computer Modelling,1997,26(12):1-11.
[6] Hall N, Potts C, Sriskandarajah C.Parallel machine scheduling with a common server[J]. Discrete Applied Mathematics,2000,102(3):223-243.
[7] Brucker P, DhaenensFlipo C, Knust S,et al. Complexity results for parallel machine problems with a single server[J]. Journal of Scheduling,2002,5(6):429-457.
[8] Jiang Y, Dong J, Ji M. Preemptive scheduling on two parallel machines with a single server[J]. Computers & Industrial Engineering,2013,66(2):514-518.
[9] Cheng T C E, Kravchenko S A, Lin B M T. Preemptive parallelmachine scheduling with a common server to minimize makespan[J]. Naval Research Logistics,2017,64(5):388-398.
[10] Hamzadayi A, Yildiz G. Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server[J]. Computers & Industrial Engineering,2016,91:66-84.
[1]张娜,史佳炳,吴彪,等.基于Netty和Kafka的IOT终端服务系统设计方案[J].浙江理工大学学报,2020,43-44(自科二):240.
ZHANG Na,SHI Jiabing,WU Biao,et al.Design scheme of IOT terminal server system based on Netty and Kafka[J].Journal of Zhejiang Sci-Tech University,2020,43-44(自科一):240.