[1] 张伟.基于资源需求分析的准时生产工厂物流优化研究[D].上海:上海交通大学,2011.
[2] 陆君伟.精益生产实施流程与细化工具[M].北京:人民邮电出版社,2009.
[3] HANSON R, BROLIN A. A comparison of kitting and continuous supply in inplant materials supply[J]. International Journal of Production Research, 2013,51(4):979-992.
[4] 常晓娥.面向混流装配线的精益物料配送方法研究[D].北京:北京交通大学,2015.
[5] GOLZ J, GUJJULA R, GUNTHER H. Part feeding at highvariant mixedmodel assembly lines [J]. Flexible Services and Manufacturing Journal,2012,24(2):119-141.
[6] EMDE S, BOYSEN N. Optimally routing and scheduling tow trains for JITsupply of mixedmodel assembly lines [J]. European Journal of Operational Research,2012,217(2):287-299.
[7] 洪旭东,徐克林,夏天.基于看板的生产线物料循环配送方式[J].工业工程,2009,12(4):116-210.
[8] 蒋丽,丁斌,臧晓宁.以工位为中心的生产物流配送优化[J].计算机集成制造系统,2009,15(11):116-210.
[9] BOYSEN N, BOCK S. Scheduling justintime part supply for mixedmodel assembly lines Original Research[J]. European Journal of Operational Research,2011,211(1):15-25.
[10] 葛茂根,刘明周,钱芳,等.基于JIT的多目标总装准时物料配送方法研究[J].中国机械工程,2011,22(23):2834-2838.
[11] DONATI V A, MONTEMANNI R, CASAGRANDE N, et al. Time dependent vehicle routing problem with a multi ant colony system [J]. European Journal of Operational Research,2008,185(3):1174-1191.